Retour au menu principal
Aichelin Logo
  • Actualités & Événements
Contact
Aichelin Logo
  1. Accueil•
  2. Actualités et Événements•
  3. Actualites•
  4. Electric glow plug saves energy + CO2
news

Electric glow plug saves energy + CO2

A constant hot topic at our customers is the increase in energy efficiency at their heat treatment plants while maintaining a high level of productivity and production safety. AICHELIN has developed a solution that can be integrated easily and perfectly into existing heat treatment systems.

About Service & Parts

The challenge

  • For safe furnace operation, excess process gases must be flared in a controlled manner.

  • The energy consumption for this is high because the pilot burners required for safe operation are supplied with natural gas.

  • Each pilot burner produces about 6 – 8 tons of CO2/year, and often 2 of them are installed per system.

  • The infrastructure around the ignition source (valves, electric control) is also maintenance-intensive and thus cost-intensive.

Aichelin elektrische Glühkerze

The solution and its added value: Our new electric glow plug – an innovation ‘made by AICHELIN’.

This enables multiple savings:

  • Electrically ignited flaring saves energy and, especially when using green electricity, more than 75% CO2. 

  • The electric glow plug causes significantly less maintenance effort and costs. 

  • Plant safety and availability remain high.

  • The production interruption caused by the retrofit is low – the plants can be handed over warm for the retrofit. 

Mit der elektrischen Glühkerze nutzen Sie also eine energieeffiziente, sichere und perfekt in Ihre Anlage integrierte Lösung. 

About modernization & modifications

Downloads
Download the product folder

Optimized Insulation of the Furnace Plants

PDF Download

Contact & Demande

Prendre contact avec Aichelin

Vous avez des questions sur notre entreprise, nos sites ou nos partenariats ? Nous nous réjouissons de votre demande et vous répondrons dans les plus brefs délais.

0/2000
News
Latest News
Overview news & events
Overview news & events
Aichelin Logo

Reliability at Work.

  • Installations et Composants

  • Industries et Applications
  • Installations de fours batch
  • Installations de fours continues
  • Technologie de chauffage industriel
  • Solutions numériques
  • Service et pièces de rechange

  • Maintenance
  • Pièces de rechange
  • Rétrofit et modifications
  • Support
  • Entreprise

  • À propos de nous
  • Entreprises du groupe Aichelin
  • Aperçu des sites
  • Carrières
  • Téléchargements
  • Actualités et Événements

Suivez-nous

© 2026 Aichelin Group

  • Mentions légales
  • Politique de confidentialité
  • Canal de signalement